LEN Fragrances

CHRYSTAL BOMB

195,00€ 1.950,00€ / l
incl. VAT and shipping costs
Size
195,00€ 1.950,00€ / l
No longer available
Available immediately - in your hands in 3 - 4 days
american_express
apple_pay
google_pay
klarna
maestro
master
paypal
shopify_pay
unionpay
visa
Free Shipping
Original products from the manufacturer and importer

Top note:
Leather notes, white Musk , vanilla

Heart note:
Freesia, Cedarwood , frankincense

Base note:
Rose, violet leaves, Raspberry

CHRYSTAL BOMB is set in Dubai and is about an Arabian princess. In the Orient everything is bright and clear, but love remains a mystery... Dubai, August 2015: “In the entrance hall of one of the most beautiful hotels, the Burj Al Arab, a young lady stood next to me, more beautiful than the stars in the sky. I was dazzled by her grace and authenticity. Her life consisted of an eternal beginning until she found her true love."

ALCOHOL DENAT., PARFUM (FRAGRANCE), AQUA (WATER), LINALOOL, ETHYLHEXYL METHOXYCINNAMATE, LIMONENE, BUTYL METHOXYDIBENZOYLMETHANE, CAPRYLIC/CAPRIC TRIGLYCERIDE, BHT, METHYL 2-OCTYNOATE, BENZYL BENZOATE

Entzündlich

E-Mail für Produktsicherheit: info@len-fragrance.com

Hersteller:
Lalene Fragrance AG
Kirchstrasse 6
8807 Freienbach
Schweiz

Other Product Identifiers

Product Type: Extrait de Parfum
Article Number: LENCB24
EAN: 4260558630043

LEN Fragrances

Very early on, Countess Jelena Artuchowkaja von Olnhausen was inspired by her family history to focus on beautiful scents. The French perfume recipes of perfumer François de la Lenes, which her family was able to preserve despite the turmoil of revolution, emigration and war, as well as an unusually large, private perfume collection from her parents, founded this fascination. Although she successfully completed her studies in economic policy with a doctorate, further academic study soon lost its appeal, so she initially worked as a journalist, auctioneer and gallery owner before dedicating herself intensively to her passion for wonderful scents. The creation of Len Fragrance was successfully completed in November 2018.